Source: DNV, Why gas bunker vessels will be critical to shipping's fuel transition (Maritime Impact, 2026) and the DNV white paper Gas bunker vessels – Facilitating the transition to alternative fuels. Read the original DNV article. Figures below are DNV's estimates, summarised in our own words.

Why this matters on the bridge and in the engine room

Choosing a new fuel is only half the job — someone must deliver it alongside, safely, in a busy port. For LNG, and soon ammonia, that "someone" is increasingly a gas bunker vessel: a small gas carrier that works as a floating fuel station, mooring ship-to-ship with receiving vessels of every size and type.

The supply gap in numbers

Indicator (DNV estimate)Value
LNG-fuelled ships in service (excluding LNG carriers)about 900
Additional LNG-fuelled ships expected before 2030about 650
Growth in LNG fuel consumption, 2020–2024more than 500%
Further growth expected, 2025–2030about 167%
LNG bunker vessels possibly needed worldwide by 2030165–208 (more than double today's fleet)

DNV's view: the market is well supplied today, but bunkering capacity is not growing as fast as the LNG-fuelled fleet. Closing the gap needs investment across the whole chain — terminals, storage, ports and vessels — not just new hulls.

Fuel producer → Terminal / storage → Gas bunker vessel → Receiving ship's fuel tank
                                      (ship-to-ship transfer in port or at anchor)

How a bunker vessel differs from a gas carrier

A bunker vessel shares containment, cargo-handling and gas-detection systems with an ordinary gas carrier, but its trade is very different:

  • Many short transfers instead of a few long voyages — more connections, disconnections and mooring operations.
  • Variety of customers — container ships, cruise ships, tankers and ferries, each with different manifold heights, fendering, tank pressures and procedures.
  • Port environment — simultaneous operations (cargo, passengers, stores) close to the transfer, plus traffic and local regulations.

These place extra demands on design (manoeuvrability, fendering, flexible transfer equipment), on procedures and, above all, on crew competence.

Conversions: a faster way to add capacity

Converting suitable small-scale LNG carriers into bunker vessels can bring capacity online sooner than newbuilds. DNV stresses that a conversion is more than bolting on a hose crane. Owners must assess:

  1. Compatibility with the intended receiving vessels.
  2. Ship-to-ship transfer arrangements, mooring and fendering.
  3. Vapour return and tank-pressure management.
  4. Manoeuvrability for frequent berthing alongside.
  5. Emergency response — emergency shutdown (ESD) and emergency release couplings.
  6. Operational readiness of crew and procedures.

Gas bunkering hazards the officer must manage

HazardWhat it means in practice
Cryogenic liquid (LNG about −162 °C)Brittle fracture of steel, cold burns; drip trays, water curtain, PPE
Vapour and boil-offPressure rise in both ships' tanks; vapour return or controlled handling
Pressure controlAgreed transfer rates and maximum pressures before starting
Flammable / toxic releaseGas detection, safety zones, ignition control; ammonia adds toxicity
Mooring failure or driftESD and emergency release couplings must work as a linked system

People, procedures, technology

DNV's message is that safe bunkering rests on three legs:

  • Technology — linked ESD, gas detection, release couplings, monitoring.
  • Procedures — compatibility assessment, a pre-transfer checklist agreed by both ships, clear allocation of who stops the transfer and when, and an emergency response plan.
  • People — trained, competent crews (IGF and IGC Code training) applying a structured safety management system every time, not only on the first job in a new port.

Common operating standards and industry checklists (for example the SGMF bunkering guidance and the IAPH LNG bunker checklists) help keep performance consistent across ports and vessel types.

Beyond LNG: ammonia and future fuels

Updated class rules and regulatory work are making dedicated ammonia bunker vessels practical. Much of what has been learned with LNG transfers carries over. DNV also argues that LNG investment is not wasted if fuels change, because the same vessels, transfer systems and experience can support bio-methane and synthetic methane directly, and inform ammonia operations.

Master's note

When a bunker vessel comes alongside, two ships become one system. Agree the plan before the first line goes ashore: who controls the transfer rate, who can stop it, how the ESD link works, and how both ships will separate in an emergency. Only start after both ships have signed the checklist.

Self-test

  1. Roughly how many LNG bunker vessels does DNV suggest may be needed worldwide by 2030?

Answer 1

Between about 165 and 208 — more than double the current fleet.

  1. Why is a gas bunker vessel's operating profile more demanding than a typical gas carrier's?

Answer 2

It makes frequent ship-to-ship transfers with many different receiving vessels in busy ports, so mooring, compatibility, procedures and crew competence are tested far more often.

  1. Name three things an owner must assess when converting a small LNG carrier to bunkering.

Answer 3

Any three of: compatibility with receiving vessels, ship-to-ship transfer and mooring arrangements, vapour and pressure management, manoeuvrability, emergency response (ESD/release couplings) and operational readiness.

  1. What are the three foundations of safe gas bunkering in DNV's view?

Answer 4

Technology, procedures and people — supported by a structured safety management system and competence development.

  1. Why might today's LNG bunkering investment still be valuable if the fuel mix changes?

Answer 5

The vessels, transfer systems, safety frameworks and experience can serve bio-methane and synthetic methane directly and inform ammonia bunkering.

  1. What extra hazard does ammonia add compared with LNG?

Answer 6

Toxicity — a release endangers people even without ignition, so detection, safety zones and PPE requirements are stricter.