Bunkering is the highest-risk routine operation in the engine department. MARPOL Annex I sets the frame; discipline does the rest.

Before transfer

  • Hold the pre-transfer conference and complete the ship/shore checklist.
  • Confirm grade, quantity, temperature, and maximum pumping rate in writing.
  • Plug scuppers, blank save-alls, rig the drip tray, post the SOPEP contact list.
  • Sound all tanks; calculate maximum receiving volumes with margin.

During transfer

  • Start at slow rate; verify oil is going to the intended tank before increasing.
  • Maintain continuous communication and agreed stop signals.
  • Sound and record at agreed intervals; watch for pressure spikes.

After transfer

  • Draught survey and final figures; note protest if figures disagree.
  • Retain the Bunker Delivery Note and a sealed MARPOL sample.

If in doubt

Stop the transfer. No schedule justifies an oil in the water.